Underwater Solutions GroupUnderwater Solutions Group

Sector

Petrochemical Jetties And Industry

Cooling water intakes, outfalls and jetty structures inspected, cleaned and repaired under plant permit procedures.

Process plants depend on water-side assets that go unnoticed until they underperform. Intake fouling, damaged screens and degraded jetty structures all reduce plant availability and all have to be addressed inside a permit-controlled environment with confirmed isolation.

Sector overview

What plants need

  • Intake and outfall cleaning within a fixed window
  • Screen and trash rack condition data
  • Jetty and loading structure inspection
  • Contractor safety compliance

How we work

  • Permit-to-work preparation before mobilisation
  • Isolation and lock-out confirmed with plant engineers
  • Before-and-after documentation for maintenance records

FAQ

Frequently Asked Questions

Can works be done without shutting the plant down?

Sometimes, depending on isolation possibilities. This is assessed together with the plant's maintenance engineers.

Do you work under the plant's permit system?

Yes. Work permits, isolation certificates, LOTO and site induction requirements of the plant take precedence and our method statement is written to fit them.

What do you deliver after cleaning an intake or basin?

Before-and-after video, quantities and type of material removed, observed condition of screens and structures and any defect that needs follow-up.

Discuss Your Scope

Send us the structure, vessel or incident and we will confirm the right operating company, method and working window.