The Question Behind The Question
When a vessel has a problem below the waterline, someone soon asks what a day out of service will cost. It sounds like a simple question. It is not. There is no credible universal daily figure, and a number borrowed from another ship rarely helps a superintendent decide what to do.
The useful question is different. Which option gets this vessel back to safe, accepted service with the least total cost and the least uncertainty? Answering that means separating delay costs, intervention costs and the risk of an incomplete repair. This article explains how to build that comparison in a way that stays honest when the plan changes.
Start With The Owner’s Numbers
A delayed ship can lose revenue, miss a berth slot or disrupt the next cargo commitment. The financial effect depends on the vessel’s employment and contract. A vessel on time charter carries a different exposure from one trading on its own account. The commercial team knows these figures. The technical team usually does not.
Ask the commercial team for the applicable daily hire or revenue exposure. Add port charges and any documented consequences of a missed schedule. Separate direct cash costs from estimates and assumptions. Mark which numbers are contractual and which are judgement. That way the comparison remains usable when the working window moves by a tide or a day.
A common mistake is to let one large, uncertain figure dominate the discussion. If the cost of a missed slot is only a guess, say so. A decision built on a labelled assumption can be revisited. A decision built on a hidden one cannot.
Compare Complete Alternatives
An afloat intervention and a dock repair may have very different cost structures. Mobilisation, inspection, engineering, permissions, berth arrangements and follow-up testing all belong in the comparison. A cheaper first quote is not necessarily a cheaper completed repair. The relevant figure is the cost of the whole route to acceptance, not the cost of the first visible step.
Dry-docking brings its own items: towing or passage to the dock, waiting for a slot, preparation of the vessel and the time needed to return to the trading area. An afloat repair brings others: diving spread, port permission, any temporary works and the inspection that the class surveyor or owner needs before accepting the result. Neither list is complete until both are written down side by side.
- Identify the earliest feasible start and realistic duration of each option.
- Include towing, dock access and vessel preparation where relevant.
- Account for additional work that would still be needed after a temporary solution.
- Note which approvals each option needs and who gives them.
Uncertainty Has A Cost Too
An inspection can reduce uncertainty before the owner commits to a repair method. If the damage is more extensive than expected, a revised decision may be safer and less expensive than continuing with an unsuitable concept. A quotation should explain the assumptions that would trigger a change, so that nobody is surprised when the first dive shows something new.
Do not count every hour underwater as an hour of saved vessel time. Cargo operations, tide and acceptance may govern the overall duration. Equally, maintenance carried out within an existing port stay can sometimes avoid creating a separate interruption. The real saving is the difference in time the vessel is unavailable for its next commitment, not the difference in working hours.
Temporary solutions deserve particular care. A temporary measure can keep a vessel trading. It can also move the cost to a later date, add a second mobilisation and leave a condition that class or the insurer will want to follow up. Write the permanent step into the comparison, even if its date is still open.
What To Send And What To Ask
A contractor can only price the real work if it receives the real picture. Clear inputs reduce allowances for the unknown, and they make quotations from different suppliers comparable.
- Send vessel particulars, location, the next fixed commitment and the available window.
- Send recent photographs or video of the affected area and any previous reports.
- Send the class or insurer position, if one has already been given.
- Ask what the quotation assumes about access, visibility and working conditions.
- Ask which findings would change the method, the price or the duration.
- Ask what deliverables the owner receives: report, photographs, measurements or records needed for acceptance.
A Short Decision Checklist
Before choosing, the superintendent should be able to answer each of these in a sentence. If an answer is missing, that is the next thing to find out, not a gap to fill with optimism.
- What is the documented daily exposure, and which parts are assumptions?
- What is the full route to acceptance for each option?
- Which option depends most on information we do not yet have?
- Is a temporary measure being compared with a permanent one?
- Who must approve the result, and what evidence will they need?
Write A Decision, Not A Sales Promise
A practical decision sheet lists options, cost inputs, schedule, acceptance conditions and unresolved questions. The owner can then choose on the same basis across suppliers. It also gives a clear record of why a choice was made, which helps when the situation changes or when the decision is reviewed afterwards.
The cost of a day out of service is real. But the best decisions do not start with a dramatic daily figure. They start with the owner’s own numbers, a complete view of each option and an honest list of what is still unknown.