Underwater Solutions GroupUnderwater Solutions Group

Sank in the evening, afloat again within one morning

Emergency Salvage Of A Sunken Tugboat In The Port Of Antwerp

A tug sank in the Port of Antwerp after a line came loose, around 22:00. Salvage started the next morning at 06:00 with a floating crane, a dive team and the group's own vessel, and the tug was afloat again within one morning.

Location
Port of Antwerp, Belgium
Operating company
Antwerp Underwater Salvage
Discipline
Salvage And Emergency Response
Client
Withheld
Emergency Salvage Of A Sunken Tugboat In The Port Of Antwerp, operational documentation image

22:00

Tug sank after a line came loose

06:00

Salvage started the next morning

24/7

Emergency response desk

The operation

How the job ran

Chapter

A line came loose

A tug sank in the Port of Antwerp after a line came loose, around 22:00 in the evening.

Salvage started the next morning at 06:00 with a floating crane, a dive team and the group's own vessel.

Chapter

Preparing the lift and securing the tanks

The group's divers prepared the lifting straps. They closed valves and leaks so that oil and gas oil from the tanks could not spread.

The group also laid the oil booms. The divers then connected the straps for the lift.

Chapter

Pumping out and sealing the leak

After the lift, the divers installed pumps and emptied the compartments one by one.

They looked for the leak and sealed it from the inside.

Chapter

Left afloat

The tug was afloat again within one morning.

With the leak sealed from the inside, the team left the tug afloat.

Scope

Scope of work executed

  • Preparation of the lifting straps by the group's divers
  • Closing valves and leaks on the tanks
  • Laying the oil booms
  • Connecting the lifting straps
  • Installing pumps and emptying the compartments one by one
  • Finding the leak and sealing it from the inside

Execution

Equipment, safety and reporting

Equipment deployed

  • Floating crane
  • The group's own vessel
  • Dive team, lifting straps and pumps
  • Oil booms

Safety measures

  • Valves and leaks closed before the lift
  • Oil booms laid to stop oil and gas oil spreading
  • Compartments emptied one by one

Outcome

Result

The tug was afloat again within one morning. With the leak sealed from the inside, the team left her afloat.

Contact

Discuss a comparable scope

Send us the structure, vessel or incident and we will confirm the right operating company, method and working window.