Underwater Solutions GroupUnderwater Solutions Group

Episode 01

Executing Underwater Works Inside A Live Port

Plan underwater work around a working terminal: access requirements, working windows, fixed section references and evidence an asset owner can use, with the MV OROSHI quay dive in Amsterdam as an example.

Duration
8 min
Published
20 Jan 2026

Listen

Episode player

Below the Surface cover artwork for the episode “Executing Underwater Works Inside A Live Port”

Takeaways

Key points from this episode

  • Treat terminal access as part of the plan and ask early what is needed before entry.
  • Agree working windows and stop conditions with the people who control the berth.
  • Divide structures with fixed references and report findings with their limitations.

Contact

Discuss a project with the group

Send us the structure, vessel or incident and we will confirm the right operating company, method and working window.